Subject. The article addresses factors of the growing cost of flying hour, which is an integral indicator of helicopter efficiency at the stage of its operation. Objectives. The purpose is to develop an econometric model of dependence of cost per flying hour on the main relative aircraft performance characteristics that determine the effectiveness of design and technological solutions for civil and multi-purpose helicopters, to make a decision at the preliminary design stage regarding the efficiency of designed product during the operational phase and the feasibility of R&D. Methods. The study rests on basic provisions of the theory of the firm, the theory of fundamental value of assets, international standards of the aviation equipment operation manual. Results. Based on econometric analysis, the main determinants of cost per flight hour are identified from the set of relative flight characteristics of the helicopter. The paper demonstrates that the number of products in operation, the cost of flight hour, the efficiency and transparency of logistics infrastructure in the provision of maintenance services represent a tool for managing the cost of product life cycle during its operation. Conclusions. The main factors having the greatest impact on the efficiency of after-sales service of products in the aviation industry are fuel efficiency, specific fuel consumption (fuel consumption per unit of power). The cost per flight hour is an integral indicator of the effectiveness of after-sales service and depends on relative flight characteristics of aircraft in operation.
Keywords: cost per flight hour, after-sales service, project life cycle, knowledge-intensive project, yield to maturity
References:
Sharpe W. Capital Asset Prices: A Theory of Market Equilibrium under Conditions of Risk. The Journal of Finance, 1964, vol. 19, iss. 3, pp. 425–442. URL: Link
Adler M., Lehmann B. Deviation from Purchasing Power Parity in the Long Run. The Journal of Finance, 1983, vol. 38, iss. 5, pp. 1471–1487. URL: Link
Rogoff K. The Purchasing Power Parity Puzzle. Journal of Economic Literature, 1996, vol. 34, iss. 2, pp. 647–668. URL: Link
O’Connor P. Practical Reliability Engineering. Chichester, John Wiley & Sons Publ., 1991, third edition, 409 p.
Fox B., Boito M., Graser J., Younossi O. Test and Evaluation Trends and Costs for Aircraft and Guided Weapons. Rand Corporation, Project Air Force, 2004. URL: Link dam/rand/pubs/monographs/2004/RAND_MG109.pdf
Fry J., Humphreys I., Francis G. Benchmarking in civil aviation: Some empirical evidence. Benchmarking: An International Journal, 2005, vol. 12, iss. 2, pp. 125–137. URL: Link
Gueresh D., Popov S.A. [Improving the fuel efficiency of a transport aircraft by minimizing the weight of its non-planar lifting surface]. Trudy MAI, 2018, no. 100. URL: Link (In Russ.)
Tishchenko M.N., Nekrasov A.V., Radin A.S. Vertolety. Vybor parametrov pri proektirovanii [Helicopters. The choice of parameters in the design]. Moscow, Mashinostroenie Publ., 1976, 366 p.
Asugman G., Johnson J., McCullough J. The Role of After-Sales Service in International Marketing. Journal of International Marketing, 1997, vol. 5, iss. 4, pp. 11–28. URL: Link
Loomba A. Linkages between product distribution and service support functions. International Journal of Physical Distribution and Logistics Management, 1996, vol. 26, iss. 4, pp. 4–22. URL: Link
Murthy D.N.P. Product warranty and reliability. Annals of Operations Research, 2006, vol. 143, iss. 1, pp. 133–146. URL: Link
Murthy D.N.P., Solem O., Roren T. Product warranty logistics: Issues and challenges. European Journal of Operational Research, 2004, vol. 156, iss. 1, pp. 110–126. URL: Link00912-8
Schmenner R.W. Service businesses and productivity. Decisions Sciences, 2004, vol. 35, iss. 3, pp. 333–347. URL: Link
Silvestro R., Fitzgerald L., Johnston R., Voss C. Towards a Classification of Service Processes. International Journal of Service Industry Management, 1992, vol. 3, iss. 3, pp. 62–75. URL: Link
Suzuki K. Estimation of Lifetime Parameters from Incomplete Field Data. Technometrics, 1985, vol. 27, iss. 3, pp. 263–271. URL: Link
Wikner J., Rudberg M. Introducing a customer order decoupling zone in logistics decision-making. International Journal of Logistics: Research and Applications, 2005, vol. 8, iss. 3, pp. 211–224. URL: Link
Wu S., Longhurst P. Optimising Age-Replacement and Extended Non-Renewing Warranty Policies in Lifecycle Costing. International Journal of Production Economics, 2011, vol. 130, iss. 2, pp. 262–267. URL: Link
Zackariasson P., Wilson T. Internetworked after-sales service. Industrial Marketing Management, 2004, vol. 33, iss. 2, pp. 75–86. URL: Link00019-1