Economic Analysis: Theory and Practice
 

Resistance to changes in project management

Vol. 14, Iss. 29, AUGUST 2015

PDF  Article PDF Version

Received: 3 February 2015

Received in revised form: 28 April 2015

Accepted: 12 May 2015

Available online: 28 August 2015

Subject Heading: MATHEMATICAL METHODS AND MODELS

JEL Classification: 

Pages: 61-68

Mel'nikova E.F. Saint Petersburg State University of Economics, St. Petersburg, Russian Federation
elena.f.melnikova@gmail.com

Importance In project development, correcting the design and estimate documentation takes a lot of time, which is usually disregarded or merely estimated through expert review during initiation and planning the design and survey works. However, both the contractor and the customer should understand and assess risks arising from making changes in overall project output and project components, the influence of the changes on the results of future phases of an integrated project.
     Objectives The purpose of the research is to define a method to assess the parameters of project implementation, taking into account the reserves for making changes.
     Methods I analyzed the instances of influence of low-quality design and estimate documentation on various stages of project life cycle; built a model of cause-effect differentiation of corrections in the documentation; formalized the dependence between the probability of project implementation and parameters of implementation (time, cost, and labor).
     Results I offer a correction resistance method of a project. It implies improving the quality of planning the design and survey works and integrated projects. The method rests on the dependence between the probability of implementing a project with preset parameters and the volume of reserves.
     Conclusions The proposed method enables to move to a qualitatively new level of communication between contractors and customers. The basis of the method is reservation; its volume is established based on statistical information on work performance in projects, taking into account the changes in project output made for a number of reasons.

Keywords: design and estimate documentation, project management, risk assessment, reserve, correction resistance

References:

  1. Shefov A.A. Mnogoproektnoe upravlenie v proektnykh organizatsiyakh Rossii: itogi, traditsii, tendentsii [Multi-project management in design organizations of Russia: results, traditions, trends]. Available at: Link. (In Russ.)
  2. Mel'nikova E.F., Lobanov O.S., Basha N.V. Prioritezatsiya proektov v inzhiniringovoi kompanii kak instrument prinyatiya operativnykh upravlencheskikh reshenii [Prioritization of projects in engineering company as a tool for quick management decisions]. Mezhdunarodnyi nauchno-issledovatel'skii zhurnal = International Research Journal, 2014, no. 8-1, pp. 65–66.
  3. Sheldrake J. Teoriya menedzhmenta ot teilorizma do yaponizatsii [Management Theory: From Taylorism to Japanization]. St. Petersburg, Piter Publ., 2001, 352 p.
  4. Funtov V.N. Osnovy upravleniya proektami v kompanii [Fundamentals of project management in companies]. St. Petersburg, Piter Publ., 2011, 400 p.
  5. Alferov V.I., Barkalov S.A., Burkov V.N., Kurochka P.N. Prikladnye zadachi upravleniya stroitel'nymi proektami [Applied problems of construction project management]. Voronezh, Tsentral'no-Chernozemnoe knizhnoe izdatel'stvo Publ., 2008, 765 p.
  6. Jones M.H. The Case for Front End Loading (FEL) and Constructability Reviews. Professional Chapter Delivered to the Greater New Orleans Chapter. Project Management Institute. Professional Development Day. PMCC, Including, 2004.
  7. Akhmetov L.A., Vorob'ev I.A. Strategiya upravleniya innovatsionnymi proektami [A strategy for innovation project management]. Putevoditel' predprinimatelya = Entrepreneur's Guide, 2013, no. 21, pp. 8–17.
  8. Sukharev O.S. Ekonomicheskaya metodologiya i politika restrukturizatsii promyshlennosti: mekhanizmy realizatsii investitsionnykh program [Economic methodology and policy of industrial restructuring: mechanisms to implement investment programs]. Moscow, Akademiya nauk o Zemle Publ., 2000, 179 p.
  9. Barkalov S.A., Burkova I.V., Kurochka P.N. Modeli i metody upravleniya stroitel'nymi proektami [Models and methods of construction project management]. Moscow, Ulanov-press Publ., 2007, 440 p.
  10. Ustyugov Yu.A. Metod optimizatsii stoimosti i vremeni vypolneniya biznes-proektov v khode planirovaniya i operativnogo upravleniya imi s uchetom innovatsionnykh izmenenii kon"yunktury rynkov [A method for cost and time optimization of business projects in the course of planning and daily management, taking into account innovation changes]. RISK: Resursy. Informatsiya. Snabzhenie. Konkurentsiya = RISC: Resources. Information. Supply. Competition, 2012, no. 4, pp. 169–175.
  11. Ustyugov Yu.A. Upravlenie innovatsionnymi proektami: optimizatsiya po stoimosti i vremeni [Innovative project management: cost and time optimization]. Sibirskaya finansovaya shkola = Siberian Financial School, 2013, no. 2, pp. 122–126.
  12. Tarasenko S.S. Otsenka podverzhennosti risku investitsionnogo proekta [Assessing the risk exposure of an investment project]. Problemy prognozirovaniya = Problems of Forecasting, 2010, no. 5, pp. 155–157.
  13. Tochilin O.V. Upravlenie riskami v innovatsionno-investitsionnom proektirovanii aviatsionnykh kompleksov [Risk management in innovation and investment design of aircraft systems]. Nauchnyi vestnik Moskovskogo gosudarstvennogo tekhnicheskogo universiteta grazhdanskoi aviatsii = Scientific Bulletin of Moscow State Technical University of Civil Aviation, 2010, no. 156, pp. 163–169.
  14. Barkalov S.A., Nguen V.Zh., Nguen T.Zh. Algoritm rascheta vremennykh parametrov grafa i prognozirovanie sroka zaversheniya modeliruemogo protsessa [The algorithm for calculating time parameters of the graph and predicting the completion date of modeled process]. Sistemy upravleniya i informatsionnye tekhnologii = Control Systems and Information Technologies, 2013, no. 3.1, pp. 116–120.
  15. Barkalov S.A., Nguen Tkhi Kuin' Chang, Rusakovskii A.M. Optimal'noe raspredelenie resursov v mul'tiproekte [Optimal allocation of resources in a multi-project]. Ekonomika i menedzhment sistem upravleniya = Economics and Management of Control Systems, 2012, no. 1, pp. 10–15.
  16. Asaul A.N., Grakhov V.P. Integrativnoe upravlenie v investitsionno-stroitel'noi sfere [Integrative management in the investment and construction sphere]. St. Petersburg, Gumanistika Publ., 2007, 248 p.
  17. Antokhina Yu.A., Varzhapetyan F.G., Ovodenko A.A., Semenova E.G. Metody i instrumenty upravleniya kachestvom proektov [Methods and tools to manage project quality]. St. Petersburg, Saint Petersburg State University of Aerospace Instrumentation Publ., 2012, 303 p.